vision | properties | about us | El Valle de Anton Chico
The Casita Still under construction. The outside needs stucco. The bamboo flooring has to be laid upstairs and the tile around the shower and tub (jacuzzi tub!). Then some trim and a few touches... NEXT >>> Photo pages: > Field, orchard, etc. >Acequia and river > Main house > Casita > Barn and tractor port > Outbuildings and grounds
The Casita
Still under construction. The outside needs stucco. The bamboo flooring has to be laid upstairs and the tile around the shower and tub (jacuzzi tub!). Then some trim and a few touches...
NEXT >>>
Photo pages:
Anton Chico, LLC